Quality and approvals

Quality,
in detail.

Our testing route and the specific approvals recorded in our September 2026 filing.

Testing and checks

Evidence before
the emblem.

Our September 2026 quality process included raw-material sampling for composition and mechanical properties and inspection of finished lots before dispatch. The in-house quality control room handled pulling, bend and impact tests.

18 Sep 2026 filing, p. 266 18 Sep 2026 filing, p. 257 18 Sep 2026 filing, p. 258

Quality across the route · September 2026

03 / BEFORE DISPATCH

Inspect finished lots

We inspected finished rolled lots and sampled them for physical and mechanical properties.

18 Sep 2026 filing, p. 266

Approval records

Approval is
specific.

The following records name particular facilities or products and dates. They do not establish current approval beyond the stated scope.

Scroll the table horizontally to read every column

IssuerScope at filing dateDateStated status / validitySource
Bureau of Indian StandardsManufacturing Unit I · licence CM/L-5900059318, referencing IS 2062:20112019Periodic renewal noted in the filing; current expiry not stated.18 Sep 2026 filing, p. 250
Central Organisation for Railway Electrification, PrayagrajChannel sections MC-100 to MC-175; angle sections 50 × 50 × 6 to 90 × 90 × 827 May 2025“Valid till cancelled” as stated in the 18 September 2026 filing.18 Sep 2026 filing, p. 489
Gujarat Energy Transmission Corporation LimitedMS & HT equal angles 40 × 40 × 4 to 200 × 200 × 26 mm; MS channels MC-100 × 50 × 5 and 125 × 66 × 6 mm; MS rounds 16–40 mm; MS flats 75 × 10 and 50 × 6 mm. Approval 846-R1.28 November 2025Validity stated through 27 November 2030 in the 18 September 2026 filing.18 Sep 2026 filing, p. 489

These are dated records from our 18 September 2026 draft filing, not a statement of present certificate validity.