Manufacturing Unit I
57,600 MT per yearRe-rolled structural steel products. FY 2025–26 production: 49,064.23 MT; capacity utilisation: 85.18%.

Manufacturing in Bhilai
Rolling, fabrication and galvanising at our Bhilai facilities.
Our operations
Unit I rolls structural steel sections. Unit II began commercial fabrication and galvanising in September 2026.
Quality and approvalsOur process
Rolling, fabrication, galvanising and inspection.
Billets are checked, reheated, descaled and passed through rolling stands to form the required section.
In-house straightening and cutting prepare steel sections for fabrication.
Steel surfaces are prepared before a molten-zinc bath provides corrosion protection.
Final checks cover rolled products, fabricated parts and galvanised coatings before dispatch.
Facilities
Re-rolled structural steel products. FY 2025–26 production: 49,064.23 MT; capacity utilisation: 85.18%.
Commercial fabrication and galvanising began in September 2026.
Planned re-rolling operations at Berla.

Products
Explore our structural sections and engineered products.
Explore products